Portable track was laid into the Kilns so the Brick Cart could be rolled in and unloaded.


Date: 

2003-12-01

Location: 

Claybank Brick Plant Site


Buildings & Structures: 

Industrial

Landscape: 

Industrial

Type: 

Image

Work: 

Light Industry